Submarine Cable System Landings
WINEMA, OREGON SUBMARINE CABLE LANDING EXECUTED - 2024 — BIFROST SYSTEM

WINEMA, OREGON SUBMARINE CABLE LANDING EXECUTED - 2024 — BIFROST SYSTEM
Project context
- Service type
- Submarine Cable System Landings
- Location
- Winema Landing, Oregon
- Date
- 2024
Scope of work
Crews on the Bifrost submarine cable system at Winema Landing prepare the shore-end buoy and reel for the beach pull. Onshore readiness — ducts proofed, pulling equipment set, crews briefed — determines whether a narrow marine landing window is met.
The scope covered beach preparation, float-in and shore-end pull, buoy recovery, and transfer of the cable into the beach manhole for splicing and testing.


